Heritage Refurbishment (Glasgow)

Case Study

Project Details

Project: The Church of Pentecost
Address: 1123 Cathcart Road, Glasgow, G42 9BD (19mins from Edgehill Road)
Client: The Church of Pentecost – UK
Contract Administrator: NBM Construction Consultants
Value: £2,000,000.00
Duration: 48 Weeks

Description

Currently engaged in the refurbishment of the grade B Listed church at Cathcart Road, behind Hampden in the Mount Florida area. The scope of works includes the largest heritage roofing project in Scotland at project inception and has been split into three concurrent phases; (Phase 1 – War Memorial Hall External / Phase 2 – Main Church External / Phase 3 – Internal works package). Works are currently ongoing and look to be completed in the final quarter of 2024

Works include but are not limited to:

• Entire replacement of all Roofing fabric
• Installation of new CUPA H3 Random slates
• Lead replacement
• Replacement of rainwater goods
• Stonework repairs/replacement
• Dry rot eradication
• Timber/rafter repairs
• Innovative cantilever scaffolding design & implementation
• Basement tanking system
• Lathe and plaster repairs
• General building fabric repairs
• Decoration
• Fit out
• New heating system
• New electrical system
• New fire detection system