Project: Escape of Water Refurbishment
Address: Giffnock, Glasgow
Client: AIG Contract
Administrator: Sedgwick International UK
Value: £65,000.00
Duration: 6 Weeks
WMR were approached directly by the policy holder and engaged directly with the Contract Administrator to produce and agree a Scope of Works to safely strip out, dry and reinstate this water damaged property.
• New electrical system
• New boiler
• Floor structure repairs and replacement
• New internal partitions and doors
• Ceiling replacement
• Bathroom replacement
• Kitchen repairs
• Plastering
• Decoration
• Tiling
• Floor covering replacement